Turnkey — from business plan to a running shift

We are accountable for the full project lifecycle, not a single delivery. One integrator, one contract, one schedule.

A plant doesn't need to piece together a puzzle of a dozen contractors: calculations, design, supply, construction, installation, testing and service run on one schedule under one area of responsibility.

This format removes the main risk of complex projects — mismatched equipment from different suppliers, usually discovered only after installation.

1. Business plan and economics

Capacity, cost per liter, payback, growth scenarios.

2. Process design

Chain diagram, layout, utilities, sanitary zoning.

3. Line configuration

Equipment selection matched to the product range and target throughput.

4. Manufacturing and FAT

Production, factory acceptance testing with the customer present.

5. Logistics and customs

Delivery to the site anywhere in the world, documentation, insurance.

6. Installation, SAT and service

Supervised installation, ramp-up, training, spare parts, 24/7 support.

Line installation at the customer's site
Factory acceptance testing (FAT)
Line handover into operation
since 2004
on the market
1000+
production facilities delivered
30%
average production profitability
3 offices
Korea · Georgia · Russia
18 mo
average payback

The gist of every reference letter is on the card. Click a card to open the scan of the original document.