Turnkey bottling & packaging lines · worldwide

Launch efficient production
with control
at every stage

We stand for efficient production

We cut losses, remove downtime and raise good output at every stage — from concept to service.

Tell us what you want to produce. The system builds a preliminary concept, and an engineer reviews and refines it. No technical jargon required upfront.

Concept·Supply·Installation·FAT / SAT·Service
01Preparation02Containers03Filling04Capping05Labeling06Packing

Stage 01 · demo

Preparation

Running
since2004
On the market
1000+
Lines commissioned
30%
Average production profitability
3offices
Korea · Georgia · Russia
18mo.
Average payback

One integrator — full accountability for the launch

9 project lifecycle stages handled on our side: from the business plan to 24/7 service. You work with one team, one contract and one point of accountability — with no gaps between suppliers.

  1. 01
    Business plan and financial model
    Payback calculation, break-even point, scenarios for raw materials and currency.
    Timeline: 5–10 daysOpen service Business plan and financial model
  2. 02
    Technical audit
    Engineer site visit, survey, technical specification and shop-floor layout.
    Timeline: 7 daysOpen service Technical audit
  3. 03
    Financing and leasing
    Packages for banks and leasing companies, agribusiness support programs, subsidies.
    Timeline: from 14 daysOpen service Financing and leasing
  4. 04
    Site selection and construction
    Site requirements, utility routing, master plan, construction works.
    Timeline: per projectOpen service Site selection and construction
  5. 05
    Line engineering
    Process technology, layout, capacity calculation, specifications.
    Timeline: 10–20 daysOpen service Line engineering
  6. 06
    Supply and logistics
    Contracts, customs, multimodal delivery to your site in any country we operate in.
    Timeline: 60–120 daysOpen service Supply and logistics
  7. 07
    Installation and commissioning
    Supervised installation, piping, electrics, automation, staff training.
    Timeline: 14–30 daysOpen service Installation and commissioning
  8. 08
    Certification and marking compliance
    Product registration, mandatory labeling, integration with tracking and accounting systems.
    Timeline: per regulationOpen service Certification and marking compliance
  9. 09
    24/7 service and warranty
    Scheduled maintenance, spare-parts warehouse, emergency call-outs, component upgrades.
    Timeline: 24-hour SLAOpen service 24/7 service and warranty

Standards of work that equipment suppliers don't offer

Build a turnkey project
Single point of accountability
One contract, one PM, one KPI — the line goes live on time.
KPI on the start-up date
Date commitments are fixed in the contract, not just in a presentation.
Spare-parts warehouse in Russia and the CIS
Key components on hand — we cut line downtime to hours.
24/7 hotline
Engineering support and remote PLC diagnostics in multiple languages.

10 production sectorswe deliver in full or in stages

Beverage production and bottling
Dairy processing
Fish processing
Quick-freezing of fruit and vegetables
Fruit and vegetable processing
Meat processing and slaughterhouses
PET container production
Bakeries
Cheese dairies
Packing of cereals and bulk products

Six steps — from the first idea to the first bottle.

01

Tell us about your product

In plain language. No BPH figures or jargon.

02

Get a concept

A modular schema and a list of open questions.

03

Review with an engineer

Parameters and open questions are validated.

04

Agree on the scope

Budget, plan, risks, deadlines — transparently.

05

Track the project

Manufacturing, delivery, installation, start-up.

06

Use the service

Digital passport and technical support.

Projects with verifiable results

Every case includes the original task, constraints, line composition, timeline and acceptance. No fictional logos.

Case studyDrinking water · PET
Production building of the Shifa plant (Agropak-Tatarstan), Leninogorsk district

Shifa plant, Leninogorsk district, Tatarstan

Water bottled in 0.5 / 1.5 / 5 / 19 L formats. Lines for 4,500 and 3,000 bottles/hour (0.5 and 1.5 L) and a 250 bottles/hour line for 19 L were commissioned in stages — the plant eliminated changeovers and cut costs.

Case studyAgro-industrial park
Kazan agro-industrial park — main building

Kazan agro-industrial park

Cost and profitability estimates per specifications of the Tatarstan Ministry of Agriculture. Identified incompatibilities between different suppliers' equipment; delivered capacity engineering and a process-chain layout compliant with sanitary rules.

Case studyPET packaging production
Equipment installation at the Formplast site: unloading a machine with a forklift and positioning it in place

New Formplast site in an industrial park

Profitability calculation, site selection in the Drozhzhanoye industrial park, equipment supply and commissioning. Result — lower cost of production and higher business profitability.

Over 1,000 lines commissioned —from local plants to national brands.

We work with producers of water, beverages, beer, dairy and food products. We present clients the way they recognize each other — a unified outline set, without flashy logos.

1000+
lines commissioned
20+
years on the market
  • Volkhovsky+beverage production
  • Aqua Lifedrinking water
  • Tomilinobottling plant
  • Florabeverages
  • Meleuz Dairydairy plant
  • Samkobrewery
  • Izhsintezchemicals / PET
  • Dombaymineral water
  • Mir Vodydrinking water
  • Vehabeverages
  • Nikolsky Bakerybakery
  • SibAquawater
  • Artesian Springwater
  • Tatspirtpromdistillery
  • Tolyattiwinery
  • Volkhovsky+beverage production
  • Aqua Lifedrinking water
  • Tomilinobottling plant
  • Florabeverages
  • Meleuz Dairydairy plant
  • Samkobrewery
  • Izhsintezchemicals / PET
  • Dombaymineral water
  • Mir Vodydrinking water
  • Vehabeverages
  • Nikolsky Bakerybakery
  • SibAquawater
  • Artesian Springwater
  • Tatspirtpromdistillery
  • Tolyattiwinery
  • Aqualifebeverages
  • Krasny Klyuchmineral water
  • Edelweissgroup of companies
  • Yangan Tauresort · water
  • Baltic Coastseafood products
  • Vereskspirits
  • Rodnikwater
  • Khitonbeverages
  • Sestritsawater
  • Tver Brewerybrewery
  • Sibmincomproduction
  • BiMolodairy products
  • Zolotaya Nivaagro holding
  • REGION Corpbeverages
  • Vremena Godawater bottling
  • Aqualifebeverages
  • Krasny Klyuchmineral water
  • Edelweissgroup of companies
  • Yangan Tauresort · water
  • Baltic Coastseafood products
  • Vereskspirits
  • Rodnikwater
  • Khitonbeverages
  • Sestritsawater
  • Tver Brewerybrewery
  • Sibmincomproduction
  • BiMolodairy products
  • Zolotaya Nivaagro holding
  • REGION Corpbeverages
  • Vremena Godawater bottling

The gist of every reference letter is on the card. Click a card to open the scan of the original document.

Takes a few minutes

Get a preliminary concept for your production.

Technical parameters can be refined later. We separate confirmed facts from assumptions and never send raw answers straight to a manager.