Every project stage is visible in your customer portal

Working with EDEN SYSTEMS runs through a single customer portal: schedule, documents, approvals, manufacturing, FAT/SAT, logistics, finance and service — in one place, in real time.

Speed
Approvals and questions are resolved in the portal, not in email threads.
Transparency
Status of every machine, document and payment without asking a manager.
Any device
Laptop, tablet or phone — the same project and the same data.

The project journey inside the portal

The portal opens at project start and stays live through warranty and service.

01

Request and inputs

Brief, objectives, target output

Confirms input data

02

Engineering

Layout, P&ID, specifications, versions

Approves the line scope

03

Contract and finance

Payment schedule, invoices, status

Confirms payment milestones

04

Manufacturing

Module readiness, factory photos and video

Raises questions on modules

05

FAT

Test protocol, punch list, video

Accepts or records rework

06

Logistics

Packing lists, shipment status, documents

Prepares the site for arrival

07

Installation and SAT

Crew schedule, checklists, certificates

Signs the acceptance

08

Service

SLA, tickets, maintenance history, spares

Opens service requests

Project portal

What it looks like inside

Below are demo screens of the portal for a sample 12,000 bph water bottling line project.

edensystems.tech/dashboard

Current stage

Request and quotation

62%

Project overview

Readiness, budget, next milestone and the team update on one screen.

Readiness
62%

62%

Stage: manufacturing

To launch

62 d

2026-11-20

Budget spent
57%

57%

1 058 000 EUR / 1 840 000 EUR

Pending approval

2

need a decision

Team update

A. Morozov · project manager

The filling monoblock is 78% assembled; capping servo drives passed incoming inspection.

Project timeline

from quotation to service
  1. 01 Request and quotation
    Completed · 04 Nov 2528 Nov 25

    Task audit, line sizing, commercial proposal

    100%
  2. 02 Contract and payments
    Completed · 29 Nov 2523 Dec 25

    Signing, payment schedule, advance payment

    100%
  3. 03 Engineering
    Completed · 10 Dec 2506 Feb 26

    Layouts, drawings, specifications for approval

    100%
  4. 04 Manufacturing
    In progress · 09 Feb 2628 Aug 26

    Building line modules and sourcing components

    74%
  5. 05 FAT
    Planned · 01 Sept 2615 Sept 26

    Factory acceptance testing before shipment

    10%
  6. 06 Logistics
    Planned · 16 Sept 2606 Oct 26

    Shipping, transport, customs clearance

  7. 07 Installation
    Planned · 07 Oct 2628 Oct 26

    Equipment installation and utility connections

  8. 08 Commissioning and SAT
    Planned · 29 Oct 2612 Nov 26

    Commissioning, site acceptance testing

  9. 09 Industrial launch
    Planned · 13 Nov 2620 Nov 26

    Reaching rated capacity

  10. 10 Service and warranty
    Planned · 21 Nov 2620 Nov 27

    Warranty, scheduled maintenance, tickets, spare parts

Project manager workspace
9:41EDN-2415

Project overview

Readiness
62%

62%

To launch: 62 d

Budget spent
57%

57%

1 058 000 EUR

Update

The filling monoblock is 78% assembled; capping servo drives passed incoming inspection.

Approvals from the phone
One source of status
Stage and unit readiness is visible without emailing a manager.
Version history
Every document keeps its author, revision and approval date.
Photo reports, not promises
Unit photos arrive from the factory as assembly progresses.
Access 24/7
The same project on laptop, tablet and phone — on the floor or on the road.

Demo data. Interface and sections are configured per project.

The project in your pocket

The portal works on phone and tablet: approve a document, review a factory photo report or open a service ticket from the shop floor or from a trip.

  • Notifications for tasks waiting on your decision
  • Documents and photo reports without installing software
  • One entry point for owner, technologist, engineer and finance

What the plant gets

No lost agreements

Decisions are recorded with author, version and date.

Fewer schedule slips

Deviations become visible while they can still be recovered.

One archive

Drawings, datasheets, certificates and acceptance records stay with the plant.

Budget control

Cost changes go through approval instead of appearing in the final invoice.

Acceptance without travel

FAT photos, video and protocols are available online.

Faster service

Line history is already in the system, engineers do not start from zero.

Access and security

Access is granted by invitation, each participant has a role, and every action is logged.

Project owner
Full access: approvals, finance and participant list.
Technologist and engineer
Engineering documents, manufacturing, FAT/SAT and service.
Finance
Payment schedule, invoices and milestone confirmations.

Project transparency and production digitalization are two different tasks

The customer portal covers transparency of working with EDEN. Digitalizing an operating line is a separate engineering service: SCADA, MES, OEE, machine vision and integration with plant systems.

Go to the Production digitalization service

We will demo the portal on your scenario

Describe your project and we will walk you through the portal, showing how stages, documents and acceptance will look in your case.

Discuss your project