Projects and case studies
Plants we've launched turnkey: from capacity calculations to bringing the line up to rated output. For every project — the task, scope of supply and result.
Drinking water · PETShifa plant, Leninogorsk district, Tatarstan
Water bottling in 0.5 / 1.5 / 5 / 19 L formats. We phased in lines rated at 4,500 and 3,000 bph for the 0.5 and 1.5 L formats and a 250 bph line for 19 L — the plant eliminated changeovers and cut costs.
View case study
Agro-industrial parkKazan agro-industrial park
Cost and profitability calculation against regional agriculture ministry specifications. We identified a mismatch between equipment from different suppliers and performed capacity engineering and process-chain alignment to sanitary standards.
View case study
PET packaging manufacturingNew site for "Formplast" in an industrial park
Profitability calculation, site selection in the "Drozhzhanoye" industrial park, equipment supply and commissioning. Result — lower unit cost and higher business profitability.
View case study
The gist of every reference letter is on the card. Click a card to open the scan of the original document.