Eden Systems — Complete Bottling Systems

One integrator — all 9 stages of a line launch

From the business plan to 24/7 service. Each service has its own page with the scope of work, timelines, equipment and answers to frequent questions.

  1. 01
    Business plan and financial model for a bottling line
    We calculate project payback before the contract is signed: scenarios for raw materials, currency, sales channels and line load. The output is a document you can take to a bank, an investor or the board.
    5–10 business daysLearn more
  2. 02
    Technical audit of the site and production facility
    Our engineers visit the site and survey the workshop, utilities and logistics. We record site constraints before they turn into rework during installation.
    7 business daysLearn more
  3. 03
    Financing, leasing and subsidies
    We prepare the document package for banks and leasing companies and help you access agricultural and regional support programs. Typical savings: 8–14% off the rate.
    from 14 daysLearn more
  4. 04
    Site selection and construction works
    We help choose a plot or existing building, connect utilities, prepare the master plan and manage construction — from groundbreaking to workshop handover.
    per projectLearn more
  5. 05
    Process line design
    Technology, specification, layout, throughput and utility calculations. The document equipment is ordered against and installation is carried out with.
    10–20 business daysLearn more
  6. 06
    Equipment supply and logistics
    Contracts, customs clearance, insurance, multimodal delivery "to the workshop door" anywhere in the world — CIS, Europe, MENA, Asia.
    60–120 daysLearn more
  7. 07
    Line installation and commissioning
    Supervised installation, piping, electrics, PLC/SCADA automation, ramp-up to rated output and staff training. We hand over the line with a signed FAT/SAT certificate.
    14–30 daysLearn more
  8. 08
    Product marking and certification
    We implement mandatory digital marking for water, juices, dairy, beer and alcoholic beverages. We integrate with the national track-and-trace system, the customer's accounting system and line equipment — from DataMatrix application to case and pallet aggregation.
    per regulator scheduleLearn more
  9. 09
    Service, maintenance and warranty around the clock
    Scheduled maintenance, a spare parts warehouse, emergency call-outs, remote PLC diagnostics. SLAs are fixed in the contract — line downtime is measured in hours, not days.
    24-hour SLALearn more