Changeover parts for a new container
Star wheels, screws, guides and grippers for a new bottle size, verified on your line.
- Output
- Manufacturing time 15–35 days
- Container
- Built to a container sample
- Material
- Food-grade polymers, stainless steel
- Input data
- A container sample or a 3D model
- Verification
- Commissioning on the customer's line
Engineering highlights
Photo-based identification
We identify a part from a photo and its marking, even if documentation is lost.
Changeover formats
Manufacturing star wheels, screws and guides for a new bottle from a sample or 3D model.
Maintenance stock
A recommended list with replacement intervals and a minimum stock level.
FAQ
Do you work with equipment from other manufacturers?
Yes. A photo of the unit, the part marking and the machine type are enough — we source an equivalent or manufacture it to sample.
How fast does a spare part arrive?
Stock items — within a week. Manufactured changeover parts — 15–35 days depending on complexity.
Request a quote: EDS-SP-FORMAT
Tell us the product, the target output and the container — we will return a specification, a layout, a budget range and a delivery schedule.
Other equipment in Spare parts and consumables
Where this machine is used
Complete lines built around this series, adjacent catalogue sections and the services that deliver them.

