Stage 02 of 9
Technical audit of the site and production facility
Our engineers visit the site and survey the workshop, utilities and logistics. We record site constraints before they turn into rework during installation.
How it works
Stages of work on our side
- 01Engineer site visitWorkshop measurements, survey of foundations, ventilation, electrics, water and drainage.
- 02Process briefProduct, packaging, throughput, automation level, regulatory requirements.
- 03Utilities auditElectrical capacity, water quality, steam, chilling, compressed air, sewage and treatment.
- 04LayoutEquipment placement, product, staff and packaging flows. 2D and 3D model.
- 05Warehouse logisticsPreform and packaging delivery routes, finished goods storage zones, docks, forklift routes.
- 06Report and recommendationsList of site upgrades required, cost and schedule estimate for construction works, project risk map.
Equipment
What we check on site
A multi-vendor approach: we select units for the task and budget, not for a single manufacturer's price list.
- Floor and foundation load capacity for heavy units (blow-fill, palletizer)
- Clearance to the truss bottom chord — for stretch-blow, conveyors and robotic palletizer
- Available electrical capacity, grid quality, backup power
- Chemical and microbiological water analysis, water treatment needs
- Steam, chilling, compressed air — capacity and connection points
- Drainage, treatment facilities, compliance with sanitary and HACCP requirements
What the customer gets
Why this works for us
Zero surprises at installation
All site non-conformities are recorded before the equipment order is placed.
One process brief
The same understanding of the project across customer, integrator and suppliers.
3D line model
We show layout and flows visually — approvals move 2–3x faster.
A priced risk map
Every finding in the report carries a cost and lead-time estimate.
The report works without us
The document is suitable for any integrator — the customer isn't locked into EDEN SYSTEMS.
Frequently asked questions
Straight answers
What if we don't have a workshop yet?
We run the audit from documents and the site plan, and separately provide requirements for the future site.
How long does the visit take?
Usually 1–2 days on site; the report follows within 7 business days of the visit.
Is the audit paid?
Yes, but its cost is credited when a design or supply contract is signed.
Do you work outside your home region?
Yes — we work worldwide: CIS, Europe, MENA, South and East Asia.
Next step
Put together a turnkey project in 5 minutes
Answer a few questions — we'll build a specification, a timeline and price estimate, and show similar case studies.
Request
Send a request for this service
Your request goes straight into our CRM and instantly notifies an engineer on Telegram. We respond within one business day.
Response SLA: 7 business days
Other lifecycle stages
01
Business plan and financial model for a bottling line
Learn more about Business plan and financial model for a bottling line
03
Financing, leasing and subsidies
Learn more about Financing, leasing and subsidies
04
Site selection and construction works
Learn more about Site selection and construction works
05
Process line design
Learn more about Process line design
Where this service is applied
Turnkey lines and catalogue sections most often delivered together with this service.
Turnkey lines
Drinking Water Filling Line, 0.33–1 L
Rinser-filler-capper monobloc for PET, water treatment, labelling and shrink packing.
Vegetable Oil Filling Line
Weight or volumetric oil filling into PET, glass and tinplate with capping, induction sealing, labelling and case packing.
Water Filling Line, 3–10 L
Filling of large-format handled PET containers, capping and shrink packing.
19-Litre Bottle Water Filling Line
Washing, disinfection and filling of returnable polycarbonate containers with capping and seal application.

