Technical audit of the site and production facility

Our engineers visit the site and survey the workshop, utilities and logistics. We record site constraints before they turn into rework during installation.

Stages of work on our side

  1. 01
    Engineer site visit
    Workshop measurements, survey of foundations, ventilation, electrics, water and drainage.
  2. 02
    Process brief
    Product, packaging, throughput, automation level, regulatory requirements.
  3. 03
    Utilities audit
    Electrical capacity, water quality, steam, chilling, compressed air, sewage and treatment.
  4. 04
    Layout
    Equipment placement, product, staff and packaging flows. 2D and 3D model.
  5. 05
    Warehouse logistics
    Preform and packaging delivery routes, finished goods storage zones, docks, forklift routes.
  6. 06
    Report and recommendations
    List of site upgrades required, cost and schedule estimate for construction works, project risk map.

What we check on site

A multi-vendor approach: we select units for the task and budget, not for a single manufacturer's price list.

  • Floor and foundation load capacity for heavy units (blow-fill, palletizer)
  • Clearance to the truss bottom chord — for stretch-blow, conveyors and robotic palletizer
  • Available electrical capacity, grid quality, backup power
  • Chemical and microbiological water analysis, water treatment needs
  • Steam, chilling, compressed air — capacity and connection points
  • Drainage, treatment facilities, compliance with sanitary and HACCP requirements

Why this works for us

Zero surprises at installation
All site non-conformities are recorded before the equipment order is placed.
One process brief
The same understanding of the project across customer, integrator and suppliers.
3D line model
We show layout and flows visually — approvals move 2–3x faster.
A priced risk map
Every finding in the report carries a cost and lead-time estimate.
The report works without us
The document is suitable for any integrator — the customer isn't locked into EDEN SYSTEMS.

Straight answers

What if we don't have a workshop yet?
We run the audit from documents and the site plan, and separately provide requirements for the future site.
How long does the visit take?
Usually 1–2 days on site; the report follows within 7 business days of the visit.
Is the audit paid?
Yes, but its cost is credited when a design or supply contract is signed.
Do you work outside your home region?
Yes — we work worldwide: CIS, Europe, MENA, South and East Asia.

Put together a turnkey project in 5 minutes

Answer a few questions — we'll build a specification, a timeline and price estimate, and show similar case studies.

Send a request for this service

Your request goes straight into our CRM and instantly notifies an engineer on Telegram. We respond within one business day.

Response SLA: 7 business days

Preferred channel

Certificate of state registration *

Drag and drop the file here or pick one · PDF, JPG, PNG, up to 10 MB

By submitting you agree to the processing of personal data.