Eden Systems — Complete Bottling Systems

Agro-industrial park

Kazan agro-industrial park

The agro-park project was assembled from specifications supplied by different vendors. Our task was both engineering and audit work: verify whether this set of equipment would actually form a working process chain, and bring it up to code.

Kazan agro-industrial park — main building
Industry
Agro-industrial complex
Role
Engineering and technical audit
Basis
Regional agriculture ministry specifications
Standard
Sanitary requirements for food production

Site photos

Facade of the Kazan agro-industrial park
Facade of the Kazan agro-industrial park
Trading hall of the agro-park with farmers' rows
Trading hall of the agro-park with farmers' rows
Forming shop for semi-finished products of an agro-park tenant
Forming shop for semi-finished products of an agro-park tenant
Meat processing section: cutter and thermal chambers
Meat processing section: cutter and thermal chambers
Meat tray packaging on an Italian Pack tray sealer
Meat tray packaging on an Italian Pack tray sealer
Automatic thermoforming and packaging line
Automatic thermoforming and packaging line

Task

Assess the project's cost and profitability, verify the compatibility of equipment from different specifications, and issue a correct process flow diagram.

What we did

  1. 1

    Audited the specifications and found throughput gaps between sections — some units would have run idle, others would have become bottlenecks.

  2. 2

    Recalculated capacities and proposed a balanced chain configuration.

  3. 3

    Aligned process flows and zoning with sanitary requirements.

  4. 4

    Delivered a cost estimate and profitability model for the final configuration.

Scope of work

Audit

Verification of specifications and equipment compatibility

Calculations

Capacities, cost, profitability

Process design

Chain diagram and sanitary zoning

Support

Defending decisions to the customer

Facing a similar task at your plant?

Describe your product, container and target volume — we'll come back with a line configuration, timeline and budget estimate. Or put together a preliminary configuration yourself in the configurator.

Open the configurator

Preferred channel

Certificate of state registration *

Drag and drop the file here or pick one · PDF, JPG, PNG, up to 10 MB

By submitting you agree to the processing of personal data.

Other projects

The gist of every reference letter is on the card. Click a card to open the scan of the original document.