Eden Systems — Complete Bottling Systems
Turnkey bottling & packaging lines · worldwide

Launch production
with transparent control
of every stage

Tell us what you want to produce. The system builds a preliminary concept, and an engineer reviews and refines it. No technical jargon required upfront.

Concept·Supply·Installation·FAT / SAT·Service
01Preparation02Containers03Filling04Capping05Labeling06Packing

Stage 01 · demo

Preparation

Running
since2004
On the market
1000+
Lines commissioned
30%
Average production profitability
3offices
Korea · Georgia · Russia
18mo.
Average payback

We don't sell equipment — we sell a predictable start-up

The client sees the entire project — from the first calculation to the first bottle. No promises without input data, no hidden assumptions, no "we'll figure it out on site."

We are accountable not just for delivering hardware, but for the line reaching planned output on the agreed date — with the required product quality and a clear cost structure.

The right configuration

Selection starts with the product, packaging and business plan — not with a machine model from a supplier's catalog.

Save 8–15% CAPEX through precisely matched capacity

Full project scope

Infrastructure, packaging, logistics, staffing, start-up and service are all accounted for in a single model.

9 lifecycle stages in a single contract

Transparent execution

Statuses, documents, risks, changes and tasks are available in the client portal 24/7 in real time.

A single source of truth for investor and site team

Measurable acceptance

Results are confirmed via FAT/SAT protocols and agreed OEE and quality metrics.

Acceptance by numbers, not by eye

Engineering accountability

The warranty covers the line as a system, not individual components. One SLA for all equipment.

24-hour SLA, spare-parts warehouse in Russia and the CIS

KPI on the start-up date

The first-bottle date is fixed in the contract with financial accountability, not just in a presentation.

Up to 21 days maximum for commissioning

10 production sectorswe deliver in full or in stages

Beverage production and bottling
Dairy processing
Fish processing
Quick-freezing of fruit and vegetables
Fruit and vegetable processing
Meat processing and slaughterhouses
PET container production
Bakeries
Cheese dairies
Packing of cereals and bulk products

Eight stages. One modular line.

Click a stage to see when it's needed and which product parameters drive the choice. Specific models are selected later, once parameters are confirmed.

Stage 04

Filling

Isobaric, volumetric or gravity filling. Speed is matched to the sales plan.

Build my schema

One integrator — full accountability for the launch

9 project lifecycle stages handled on our side: from the business plan to 24/7 service. You work with one team, one contract and one point of accountability — with no gaps between suppliers.

  1. 01
    Business plan and financial model
    Payback calculation, break-even point, scenarios for raw materials and currency.
    Timeline: 5–10 daysRead more
  2. 02
    Technical audit
    Engineer site visit, survey, technical specification and shop-floor layout.
    Timeline: 7 daysRead more
  3. 03
    Financing and leasing
    Packages for banks and leasing companies, agribusiness support programs, subsidies.
    Timeline: from 14 daysRead more
  4. 04
    Site selection and construction
    Site requirements, utility routing, master plan, construction works.
    Timeline: per projectRead more
  5. 05
    Line engineering
    Process technology, layout, capacity calculation, specifications.
    Timeline: 10–20 daysRead more
  6. 06
    Supply and logistics
    Contracts, customs, multimodal delivery to your site in any country we operate in.
    Timeline: 60–120 daysRead more
  7. 07
    Installation and commissioning
    Supervised installation, piping, electrics, automation, staff training.
    Timeline: 14–30 daysRead more
  8. 08
    Certification and marking compliance
    Product registration, mandatory labeling, integration with tracking and accounting systems.
    Timeline: per regulationRead more
  9. 09
    24/7 service and warranty
    Scheduled maintenance, spare-parts warehouse, emergency call-outs, component upgrades.
    Timeline: 24-hour SLARead more

Standards of work that equipment suppliers don't offer

Build a turnkey project
Single point of accountability
One contract, one PM, one KPI — the line goes live on time.
KPI on the start-up date
Date commitments are fixed in the contract, not just in a presentation.
Spare-parts warehouse in Russia and the CIS
Key components on hand — we cut line downtime to hours.
24/7 hotline
Engineering support and remote PLC diagnostics in multiple languages.

From minimum CAPEX to full automation.

We don't offer an off-the-shelf line by template. A scenario is selected only after confirming the product, packaging and output plan.

Start

Minimum CAPEX

Entry threshold

  • Semi-automatic units, more manual operations
  • Modular growth over time
  • Fast start-up on a limited footprint
Not a universal option for every small project — input data is required.
Recommended

Optimal

Balance of CAPEX and OPEX

  • Balanced automation of key stages
  • 15–25% capacity headroom
  • Ready for a second shift without retooling
A recommendation is only given after product, packaging and sales plan are confirmed.

Automation

High automation

Scale and stability

  • Automation from water treatment to palletizing
  • Minimal staff per shift
  • SCADA, MES integration and a digital passport
Requires prepared infrastructure and higher utilization.

Six steps — from the first idea to the first bottle.

01

Tell us about your product

In plain language. No BPH figures or jargon.

02

Get a concept

A modular schema and a list of open questions.

03

Review with an engineer

Parameters and open questions are validated.

04

Agree on the scope

Budget, plan, risks, deadlines — transparently.

05

Track the project

Manufacturing, delivery, installation, start-up.

06

Use the service

Digital passport and technical support.

Everything under control. And you can see it in advance.

Every project runs in a single portal: phases, tasks, documents, finance, risks and 24/7 service. The client sees a confirmed status, the team sees engineering depth. One source of truth for both sides.

Access is granted by an EDEN SYSTEMS administrator. There is no open registration.

cabinet.edensystems.com / projects / aqua-kartli

Progress

62%

Milestones

4 / 7

Open risks

2

Budget

4.1 / 6.8M €

Project roadmap

Updated 2 minutes ago

Discovery

Engineering

Manufacturing

FAT

Logistics

SAT

Launch

Client tasks

  • Site layout .dwg

    due 12.06

  • Approve label design

    due 20.06

  • Sign off FAT protocol

    done

Documents

  • Contract v3.2Signed
  • Technical spec v1.8Approved
  • FAT protocol draftUnder review
  • Change Request #04Awaiting approval

Automation

  • SCADA · telemetry received

    1 min ago

  • IoT · CIP temperature nominal

    3 min ago

  • Trigger · invoice 07 → ERP

    18 min ago

  • AI risk summary generated

    1 h ago

Response SLA

< 15 min

On-duty engineer

Portal uptime

99.98%

30 days

Open tickets

0 / 12

all within SLA

Remote monitoring

24 / 7

SCADA + IoT

One truth for both sides

The client and the team work in the same interface. No status calls needed.

Transparency at every stage

Milestones, documents, finance, risks — with dates and confirmations.

Automation instead of emails

Events from SCADA, ERP, warehouse and logistics feed the project timeline automatically.

24/7 service after start-up

Tickets, SLA, spare parts and remote monitoring — in the same portal as the project.

Over 1,000 lines commissioned —from local plants to national brands.

We work with producers of water, beverages, beer, dairy and food products. We present clients the way they recognize each other — a unified outline set, without flashy logos.

1000+
lines commissioned
20+
years on the market
  • Volkhovsky+beverage production
  • Aqua Lifedrinking water
  • Tomilinobottling plant
  • Florabeverages
  • Meleuz Dairydairy plant
  • Samkobrewery
  • Izhsintezchemicals / PET
  • Dombaymineral water
  • Mir Vodydrinking water
  • Vehabeverages
  • Nikolsky Bakerybakery
  • SibAquawater
  • Artesian Springwater
  • Tatspirtpromdistillery
  • Tolyattiwinery
  • Volkhovsky+beverage production
  • Aqua Lifedrinking water
  • Tomilinobottling plant
  • Florabeverages
  • Meleuz Dairydairy plant
  • Samkobrewery
  • Izhsintezchemicals / PET
  • Dombaymineral water
  • Mir Vodydrinking water
  • Vehabeverages
  • Nikolsky Bakerybakery
  • SibAquawater
  • Artesian Springwater
  • Tatspirtpromdistillery
  • Tolyattiwinery
  • Aqualifebeverages
  • Krasny Klyuchmineral water
  • Edelweissgroup of companies
  • Yangan Tauresort · water
  • Baltic Coastseafood products
  • Vereskspirits
  • Rodnikwater
  • Khitonbeverages
  • Sestritsawater
  • Tver Brewerybrewery
  • Sibmincomproduction
  • BiMolodairy products
  • Zolotaya Nivaagro holding
  • REGION Corpbeverages
  • Vremena Godawater bottling
  • Aqualifebeverages
  • Krasny Klyuchmineral water
  • Edelweissgroup of companies
  • Yangan Tauresort · water
  • Baltic Coastseafood products
  • Vereskspirits
  • Rodnikwater
  • Khitonbeverages
  • Sestritsawater
  • Tver Brewerybrewery
  • Sibmincomproduction
  • BiMolodairy products
  • Zolotaya Nivaagro holding
  • REGION Corpbeverages
  • Vremena Godawater bottling

The gist of every reference letter is on the card. Click a card to open the scan of the original document.

Projects with verifiable results

Every case includes the original task, constraints, line composition, timeline and acceptance. No fictional logos.

Case studyDrinking water · PET
Production building of the Shifa plant (Agropak-Tatarstan), Leninogorsk district

Shifa plant, Leninogorsk district, Tatarstan

Water bottled in 0.5 / 1.5 / 5 / 19 L formats. Lines for 4,500 and 3,000 bottles/hour (0.5 and 1.5 L) and a 250 bottles/hour line for 19 L were commissioned in stages — the plant eliminated changeovers and cut costs.

Case studyAgro-industrial park
Kazan agro-industrial park — main building

Kazan agro-industrial park

Cost and profitability estimates per specifications of the Tatarstan Ministry of Agriculture. Identified incompatibilities between different suppliers' equipment; delivered capacity engineering and a process-chain layout compliant with sanitary rules.

Case studyPET packaging production
Equipment installation at the Formplast site: unloading a machine with a forklift and positioning it in place

New Formplast site in an industrial park

Profitability calculation, site selection in the Drozhzhanoye industrial park, equipment supply and commissioning. Result — lower cost of production and higher business profitability.

Takes a few minutes

Get a preliminary concept for your production.

Technical parameters can be refined later. We separate confirmed facts from assumptions and never send raw answers straight to a manager.