Eden Systems — Complete Bottling Systems
Stage 04 of 9

Site selection and construction works

We help choose a plot or existing building, connect utilities, prepare the master plan and manage construction — from groundbreaking to workshop handover.

Stages of work on our side

  1. 01
    Site requirements
    Area, clear height, loads, electricity, water, drainage, logistics, sanitary zone.
  2. 02
    Selection
    We search among existing buildings, industrial parks, special economic zones, or find a plot for construction.
  3. 03
    Master plan and design
    Workshop layout, warehouse, sanitary zones, administrative block, checkpoints.
  4. 04
    Permits
    Site plan, utility connection specs, design review, construction permit.
  5. 05
    Construction works
    We manage construction as general contractor or technical supervisor. Workshop handed over shell-and-core-plus-finishes.
  6. 06
    Ready for installation
    Flooring, crane beams, switchgear room, water treatment, ventilation — the workshop is ready to receive the line.

What we do on site

A multi-vendor approach: we select units for the task and budget, not for a single manufacturer's price list.

  • Industrial flooring with a hardened top layer for equipment loads
  • Switchgear room, transformer, cable routes and backup power
  • Water treatment: mechanical filtration, reverse osmosis, UV, mineralization
  • Steam, chilling, compressor station and compressed air networks
  • Supply and exhaust ventilation, positive-pressure zones for clean rooms
  • Local treatment facilities, grease traps, discharge metering

Why this works for us

Process engineer × builder in sync
The layout accounts for product flows from day one, not adjusted after the fact.
Special economic zones and industrial parks
Partnerships with major industrial parks and technology zones.
Single point of control
One team — from groundbreaking to signing off on commissioning.
Resident incentives
We help you obtain special economic zone resident status — savings on taxes and utility connections.
Supervision without construction
If your own contractor builds, we take on technical supervision on the customer's behalf.

Straight answers

We already have a workshop
Great. In the audit we record non-conformities and adapt the site for the line.
How long does building from scratch take?
For a 2,000–4,000 m² workshop — usually 8–14 months from permit to handover, depending on region and utilities.
Can we lease a building instead of building?
Often that's the smarter move: it saves 6–10 months. We select a building that fits the specific line configuration.
Who handles utility connections?
We take on the technical specs and contracts for power, water and gas connections.

Put together a turnkey project in 5 minutes

Answer a few questions — we'll build a specification, a timeline and price estimate, and show similar case studies.

Send a request for this service

Your request goes straight into our CRM and instantly notifies an engineer on Telegram. We respond within one business day.

Response SLA: per project

Preferred channel

Certificate of state registration *

Drag and drop the file here or pick one · PDF, JPG, PNG, up to 10 MB

By submitting you agree to the processing of personal data.