Marking and inspection in the line: date coding, codes, rejection

Marking is no longer just a date on the bottle. Today it is a link between code application, verification, aggregation into cases and pallets, and data transfer to the information system.

7 min readUpdated August 7, 2026
Ink-jet marker in a filling line

Two different levels

The first level is production date coding: date, shift, batch number. Applied by ink-jet printer or laser and used for internal traceability.

The second level is mandatory product identification marking for regulated categories. Here the code is received from an external system, applied, verified by camera, and rejected codes are withdrawn from circulation.

A missed or unreadable code at the second level is not a cosmetic defect but a product that cannot be sold. That is why verification is placed immediately after application.

Application methods

MethodSurfaceComment
Ink-jet printingPET, glass, filmUniversal, requires ink consumables
Laser engravingGlass, carton, some filmsNo consumables, but not all materials
Thermal transferFlexible packagingHigh resolution, printing on moving film
Print and apply labelCases, palletsStandard for aggregation
Machine vision system for bottle inspection

What inspection controls

Fill level
Rejects underfill and overfill before packaging.
Cap presence and position
Crooked or missing cap is removed from the conveyor.
Label
Presence, position and SKU correctness.
Code readability
Camera verification of each applied code.
Foreign inclusions
For transparent products — light inspection.

FAQ

Can marking be added to an existing line?

Yes, it is one of the most common upgrades. Space on the conveyor, integration with the accounting system and usually a reconfiguration of packaging section speeds are needed.

What to do with defective codes?

They must be automatically withdrawn from circulation in the system, and physically rejected production must go to a separate tray. Manual accounting does not work here.

Is inspection needed on a small line?

At minimum, level and cap control. This is the cheapest place to catch defects that would otherwise return from the retail chain.

Calculation on the topic

We will calculate your line

Describe the product, packaging formats and planned volume — we will prepare a line scheme, specification and preliminary budget estimate with payback.

  • Line scheme and unit specification for your product
  • Budget range and payback period
  • Site requirements: power, water, personnel
Select a line in the configurator

Удобный канал связи

Свидетельство о госрегистрации *

Перетащите файл сюда или выберите на устройстве · PDF, JPG, PNG, до 10 МБ

Отправляя форму, соглашаетесь с обработкой персональных данных.