Mineral water production: plant price and composition

Mineral water differs from drinking water by the requirements to preserve the natural composition: gentle treatment, degassing and re-carbonation, work with the well. Below are plant configurations and budget structure.

  • mineral water production equipment price
  • mineral water bottling plant turnkey
  • mineral water filling line for sale
  • carbonated mineral water filling
Request a line calculation
Mineral water preparation section

Mineral water plant configurations

Starter
2,000-4,000 bph

Water intake from well, filtration, UV, saturator, triblock, labeling

Area
from 300 m²
Lead time
3-5 months
Mid-range
6,000-12,000 bph

Raw water tanks, degassing and re-carbonation, PET blowing, triblock, wrap-around labeling, packaging

Area
from 700 m²
Lead time
5-7 months
Plant
from 18,000 bph, PET and glass

Two filling streams, combiblock, laboratory, warehouse, SCADA and batch tracking

Area
from 1,500 m²
Lead time
8-12 months

What shapes a mineral water project budget

Budget itemWhat is includedWhat affects cost
Well and water intakePump equipment, stainless steel pipelines, tanks, coolingWell yield, distance, water composition
Gentle treatmentMechanical filtration, iron removal, UV, degassing if neededAnalysis protocol and mineral composition preservation requirements
CarbonationSaturator, CO2 station, deaeratorCarbonated, lightly carbonated or still range
Filling and packagingTriblock, PET blowing or glass feeding, cappingCapacity and format portfolio
Laboratory and trackingControl instruments, batch traceability, markingCertification and sales channel requirements

Mineral water is a project around the well. The source composition, yield and the requirement to preserve the natural mineral content determine the scheme and budget more than filling capacity.

How we calculate a mineral water plant

  1. Step 1
    Study the source

    Analysis protocol, well yield, seasonal composition stability, iron, hydrogen sulfide and gas content. This is the foundation of the entire project.

  2. Step 2
    Design gentle treatment

    The task is to remove unwanted components without destroying the natural mineral composition. Degassing, iron removal, UV instead of aggressive schemes.

  3. Step 3
    Define the product range

    Still, lightly and highly carbonated, glass and PET. We calculate carbonation and format compatibility on one line.

  4. Step 4
    Prepare documentation

    Balneological opinion, declarations, mineral water marking requirements. Approval timelines affect the launch schedule as much as delivery.

  5. Step 5
    Assemble estimate by stages

    Well head and pipeline, treatment, filling, decoration, warehouse. We show phasing: what we launch first, what we add later.

Questions about mineral water production

How is a mineral water line different from drinking water?

Drinking water can be brought to the desired composition by RO; mineral water must be preserved: treatment is minimal and equipment is selected for the specific well analysis.

Can both carbonated and still ranges be produced?

Yes, via a saturator bypass. Plan changeover and separate buffer tanks for each range.

Where does the project start?

From a full water analysis protocol and well yield data. Without them any budget figure is conditional.

Detailed materials on the topic

Calculate a mineral water plant

Send the source analysis protocol, well yield and planned range. We will provide a process flow diagram and estimate by stages.