Mineral water production: plant price and composition
Mineral water differs from drinking water by the requirements to preserve the natural composition: gentle treatment, degassing and re-carbonation, work with the well. Below are plant configurations and budget structure.
- mineral water production equipment price
- mineral water bottling plant turnkey
- mineral water filling line for sale
- carbonated mineral water filling

Mineral water plant configurations
Water intake from well, filtration, UV, saturator, triblock, labeling
- Area
- from 300 m²
- Lead time
- 3-5 months
Raw water tanks, degassing and re-carbonation, PET blowing, triblock, wrap-around labeling, packaging
- Area
- from 700 m²
- Lead time
- 5-7 months
Two filling streams, combiblock, laboratory, warehouse, SCADA and batch tracking
- Area
- from 1,500 m²
- Lead time
- 8-12 months
What shapes a mineral water project budget
| Budget item | What is included | What affects cost |
|---|---|---|
| Well and water intake | Pump equipment, stainless steel pipelines, tanks, cooling | Well yield, distance, water composition |
| Gentle treatment | Mechanical filtration, iron removal, UV, degassing if needed | Analysis protocol and mineral composition preservation requirements |
| Carbonation | Saturator, CO2 station, deaerator | Carbonated, lightly carbonated or still range |
| Filling and packaging | Triblock, PET blowing or glass feeding, capping | Capacity and format portfolio |
| Laboratory and tracking | Control instruments, batch traceability, marking | Certification and sales channel requirements |
Mineral water is a project around the well. The source composition, yield and the requirement to preserve the natural mineral content determine the scheme and budget more than filling capacity.
How we calculate a mineral water plant
- Step 1Study the source
Analysis protocol, well yield, seasonal composition stability, iron, hydrogen sulfide and gas content. This is the foundation of the entire project.
- Step 2Design gentle treatment
The task is to remove unwanted components without destroying the natural mineral composition. Degassing, iron removal, UV instead of aggressive schemes.
- Step 3Define the product range
Still, lightly and highly carbonated, glass and PET. We calculate carbonation and format compatibility on one line.
- Step 4Prepare documentation
Balneological opinion, declarations, mineral water marking requirements. Approval timelines affect the launch schedule as much as delivery.
- Step 5Assemble estimate by stages
Well head and pipeline, treatment, filling, decoration, warehouse. We show phasing: what we launch first, what we add later.
Questions about mineral water production
Drinking water can be brought to the desired composition by RO; mineral water must be preserved: treatment is minimal and equipment is selected for the specific well analysis.
Yes, via a saturator bypass. Plan changeover and separate buffer tanks for each range.
From a full water analysis protocol and well yield data. Without them any budget figure is conditional.
Detailed materials on the topic
Related clusters
Adjacent filling and packaging directions: line composition, budget and timelines differ — compare the options.

Из чего складывается цена линии розлива воды: водоподготовка, выдув ПЭТ, розлив, этикетировка, упаковка. Типовые конфигурации от 2 000 до 18 000 бут/ч и расчет под площадку.
View calculation
Сколько стоит водоподготовка для розлива: предподготовка, обратный осмос, минерализация, УФ и озон, разводка. Станции от 2 до 25 кубометров в час.
View calculation
Стоимость линии розлива газировки: купажное отделение, сатуратор, изобарический триблок, этикетировка и упаковка. Конфигурации от 2 000 до 18 000 бут/ч.
View calculation
Стоимость участка розлива воды в бутыли 19 л: мойка оборотной тары, водоподготовка, инспекция, оборотный парк. Конфигурации от 100 до 900 бутылей в час.
View calculationCalculate a mineral water plant
Send the source analysis protocol, well yield and planned range. We will provide a process flow diagram and estimate by stages.