Blending department: tanks, agitators and section logic
The blending section determines recipe reproducibility. If it is designed without reserve, the filling line stands idle waiting for the next batch — and all filling capacity becomes meaningless.

How many tanks are needed
The minimum workable scheme is two blending tanks: while one supplies product to the line, the second is prepared and cleaned. A single tank means filling stops during preparation and cleaning.
Each tank volume is based on the line hourly capacity: typically 1.5-2 hours of continuous operation. Tanks that are too large are also harmful — cleaning time increases and the product residence time in the tank grows.
A separate tank is allocated for syrup or concentrate with its own agitator and filtration.
Design solutions
- Agitator type
- Frame for viscous products, propeller and turbine for liquids, magnetic for sterile media.
- Jacket
- Heating or cooling for recipes requiring temperature control.
- Material
- AISI 304 for neutral products, 316L for acidic and saline media.
- CIP heads
- Cleaning balls or rotary heads providing full internal surface coverage.
- Instrumentation
- Level, temperature, and if needed density meter and pH meter with logging to the system.

Tank volume selection by line
| Filling capacity | Working tank volume | Quantity |
|---|---|---|
| Up to 3,000 bph 0.5 L | 3-5 m³ | 2 |
| 6,000 bph 0.5 L | 5-8 m³ | 2-3 |
| 12,000 bph 0.5 L | 10-15 m³ | 3 |
| 19 L line, 600 bph | 10-12 m³ | 2 |
FAQ
Can one tank be enough?
Only for single-shift operation with long pauses. For shift work this means guaranteed line downtime.
Is automatic ingredient dosing needed?
With more than three or four recipes, automation pays off quickly: it removes human error and gives reproducible taste.
How often are blending tanks cleaned?
After each batch when changing recipes, and by routine when running one product — usually once per shift or per day.
Read next
Ready solutions
Equipment catalog
Project services
Related projects
Calculation on the topic
We will calculate your line
Describe the product, packaging formats and planned volume — we will prepare a line scheme, specification and preliminary budget estimate with payback.
- Line scheme and unit specification for your product
- Budget range and payback period
- Site requirements: power, water, personnel